The SVR remained closed until August which meant that 2857 covered a very small fraction of its normal mileage in 2020. That said, the loco has worked virtually daily throughout August without putting a foot (a wheel?) wrong. In[…]

Over the winter the opportunity was taken to straighten up and tidy the injector steam pipes running down the back head so that they meet with the valves vertically, rather than in the cranked positions erroneously set at the[…]

In June some cracks in the copper firebox, which looked like old repairs, were welded and several rivets were replaced with patch screws. On the carriage heating it was decided to dispense with the ‘Sarco’ unit and to pursue[…]

By February, numerous complaints had come in on the vacuum brake. It was overhauled, resulting in it maintaining 25” vacuum at 5mph. A driving spring broke on a Saturday at the beginning of April but it was replaced and[…]

2857’s 100th birthday was celebrated on 2nd and 3rd June 2018. This involved 2857 running with all the operable wagons from the ‘813 Fund’ collection showing freight trains as they were, while a GB Railfreight class 66 diesel electric[…]

The intermediate overhaul was quite extensive in the end and included casting, machining and fitting new cylinder liners, a corresponding set of new pistons, overhauled piston rods, new valve spindles, new valve assemblies, all valve and piston rings replaced,[…]

A decision was taken to replace all the small boiler tubes as it was felt they were unlikely to last the full 10 years of the boiler certificate and would be better replaced at his time in readiness for[…]

We started the year with a Volunteer-led deep clean of the engine at Bridgnorth, including steam cleaning between the frames. Due to loco shortages the SVR requested to defer cylinder re-bore yet again, until the autumn. There were concerns[…]

By August the big ends were knocking badly and the crosshead cotters had become loose, so the big ends were remetalled and cotters replaced ahead of the repair scheduled for the winter. At about the same time the vacuum[…]

Over the winter the tender right hand leading axlebox was re-metalled after it ran hot undetected, probably during the 2015 Santa running. In March there was another failure of the piston rings and snap rings. The valve cover bushes[…]